logo IPPC
      FAQ            Log in

Showing 5191 to 5200 of 5745 results in Everything matching your query: WA 0859 3970 0884 Hitung Biaya Renovasi Gudang Baja 2 Lantai Terpercaya Ngemplak Boyolali

5191) First Report of Erythrina Gall Wasp in Barbados

First report of Erythrina wasp in Barbados

read more
5192) Pest Outbreak on Vaitupu

ON the 6th September the first sign of damage was detected. To maintain the spreading during the outbreak, the infected …

read more
5193) Emergency measures for tomato and capsicum seed: Tomato brown rugose fruit virus

The Department of Agriculture, Water and the Environment has implemented urgent actions to address the risk of Tomato brown rugose …

read more
5194) Emergency measures to address the risk of introduction of peanut smut (Thecaphora frezii) in peanuts from countries where peanut smut is recorded

Recent publication (Rago et al. 2017) highlighted the increased risk of peanut smut (Thecaphora frezii) associated with peanuts produced in …

read more
5195) Compiled comments on draft specifications posted!

Compiled comments from the 2017 consultation on draft specifications have been posted on the IPP: https://www.ippc.int/en/core-activities/standards-setting/member-consultation-draft-specifications-ispms/ The IPPC Secretariat thanks …

read more
5196) The little fireant, Wasmannia auropunctata, in French Polynesia : report and official control

The little fireant, Wasmannia auropunctata, in French Polynesia : report and official control

read more
5197) La petite fourmi de feu, Wasmannia auropunctata en Polynésie française et campagne de lutte

La petite fourmi de feu, Wasmannia auropunctata en Polynésie française et campagne de lutte

read more
5198) Tomato Yellow Leaf Curl Virus on tomato plants

Reduced internodes --> stunted appearance of the plant ; new leaves reduced in size and yellowed between the veins ; …

read more
5199) Pest status in Montenegro

Pest status in 2017

read more
5200) New model of PhytosanitaryCertificate (PC) and Import Certificate

NPPO-MM will start using the model of PC and IC on 1st November 2017.

read more