logo IPPC
      FAQ            Log in

Showing 5861 to 5870 of 5906 results in Everything matching your query: WA 0859 3970 0884 Kontraktor Pembuatan Rumah 1 Lantai 4 Kamar Murah Kaliwungu Kab Semarang

5861) Valuable support from the EU supports participation in IPPC work programme

Discussions during workshop on draft ISPMsTo ensure that the work of the IPPC is relevant, of high quality and acceptable …

read more
5862) Solenopsis mealybug in parts of central and northern Queensland

Solenopsis mealybug was detected in cotton crops and ornamental plants in a number of locations in Queensland. Due to the …

read more
5863) Update on branched broomrape in South Australia - move to offical control

Branched broomrape is a parasitic weed of a wide range of broadleaf crops internationally. Broomrapes are root parasites that extract …

read more
5864) 2F - Règlement sur la protection des végétaux

Règlement sur la protection des végétaux (DORS/95-212)

read more
5865) Detection of mango malformation disorder in Queensland, Australia

The affected property has been placed under quarantine pending completion of diagnostic testing. Tracing of movement of plant material from …

read more
5866) Pest Notification - Sugar Cane Orange Rust - January 5th 2010

See file attached.

read more
5867) New IPPC website released

The new site retains the URL from the previous website and contains all of the content that was available in …

read more
5868) Information exchange workshop with the NPPO in Libreville Gabon

In November 2009, a workshop was held in Libreville, Gabon, with the aim of increasing familiarity with the Convention and …

read more
5869) Open-Ended Working Group to Finalize the Operational Plan and Develop an Implementation Framework for the IPPC Capacity Building Strategy

Arrangements for a meeting of an Open-Ended Working Group (OEWG) to finalize the operational plan and develop an implementation framework …

read more
5870) Compiled member comments on draft ISPMs - 2009

Compiled member comments on draft ISPMs sent for consultation through the 2009 regular process have been compiled.

read more