logo IPPC
      FAQ            S'identifier

2401 à 2410 résultats 2836 correspondent à Tout votre recherche: WA 0859 3970 0884 Jasa Bongkar Pasang Pintu Minimalis Yang Bagus Srandakan Bantul

2401) Pest Outbreak on Vaitupu

ON the 6th September the first sign of damage was detected. To maintain the spreading during the outbreak, the infected …

Lire la suite
2402) First Report of Erythrina Gall Wasp in Barbados

First report of Erythrina wasp in Barbados

Lire la suite
2403) The importance of actively protecting the IPPC certification of wood packaging material - ISPM 15. A successful action!

Several countries have needed to initiate their national legal process to protect the IPPC certification mark (from ISPM 15: 2009) …

Lire la suite
2404) Changes to Cut Flower Import Conditions entering Australia

As part of the ongoing systematic review of Australia’s import conditions, the Department of Agriculture and Water Resources (the department) …

Lire la suite
2405) Emergency measures for tomato and capsicum seed: Tomato brown rugose fruit virus

The Department of Agriculture, Water and the Environment has implemented urgent actions to address the risk of Tomato brown rugose …

Lire la suite
2406) The little fireant, Wasmannia auropunctata, in French Polynesia : report and official control

The little fireant, Wasmannia auropunctata, in French Polynesia : report and official control

Lire la suite
2407) La petite fourmi de feu, Wasmannia auropunctata en Polynésie française et campagne de lutte

La petite fourmi de feu, Wasmannia auropunctata en Polynésie française et campagne de lutte

Lire la suite
2408) Tomato Yellow Leaf Curl Virus on tomato plants

Reduced internodes --> stunted appearance of the plant ; new leaves reduced in size and yellowed between the veins ; …

Lire la suite
2409) Organigram NPPO MNE

The Ministry of Agriculture and Rural Development is the public administration body in charge of policy making and adoption of …

Lire la suite
2410) IPPC Workshops in Central Africa to discuss meeting national reporting obligations and participation in the standard setting process.

Two workshops were held in Libreville, Gabon, from 29 October - 03 November for 10 Central African countries as part …

Lire la suite